Success Stories
Our expert cooperation, effective solutions and pro-active problem-solving gives our customer lifetime value and lets them focus on their own business.
Redpath
Redpath breaking the records in Olympic Dam mine with a fleet of Utimec XL 1100 Agitator EDs
Redpath piloted the first Utimec XL 1100 Agitator ED, the diesel-electric 10.5 m³ capacity concrete truck at BHP’s Olympic Dam mine.
Processes and products
Sprayed Concrete, Utimec XL 1100 Agitator ED
Redpath breaking the records in Olympic Dam mine with a fleet of Utimec XL 1100 Agitator EDs;Learn moreThe Oriente Tunnel Project, Colombia- Rock and Ground Support Optimisation
Significant decrease in water ingress achieved with teamwork and TamCrete MFC Fast Set
Processes and products
Rock and Ground Support, TamCrete MFC / SFC
The Oriente Tunnel Project, Colombia- Rock and Ground Support Optimisation ;Learn moreTesting the Lekatech’s Fully Electric Hammer in the Scamec LC Thor 095 A
Tailored for a need
Collaboration with Redpath in developing a cable bolter support vehicle Variomec XS 025 Crane
Redpath breaking the records in Olympic Dam mine with a fleet of Utimec XL 1100 Agitator EDs
Redpath piloted the first Utimec XL 1100 Agitator ED, the diesel-electric 10.5 m³ capacity concrete truck at BHP’s Olympic Dam mine.
Jetcrete leading the way with Australia's first Utimec LF 700 Agitators – again
The latest L-series with a Stage V engine excels in performance and comfort, cementing Jetcrete’s role as a trendsetter in mining tech.
Sydney Metro, Australia - TBM Technology Optimisation
Extensive performance testing meets dedicated on-site technical support
The Oriente Tunnel Project, Colombia- Rock and Ground Support Optimisation
Significant decrease in water ingress achieved with teamwork and TamCrete MFC Fast Set
Land Transport Authority – Downtown Line 3, Singapore - Optimisation
Tunnelling works completed on schedule after switching to our custom-developed product
Caldecott Station, Singapore - Waterproofing Solutions
The first mined tunnel in Singapore to use spray applied waterproofing membrane
Crossrail C310 – Thames Tunnel Section, United Kingdom - Sprayed Concrete Optimisation
Trials organized within a week from contact to find effective rock support for wet conditions
Hindustan Zinc (HZL) RA Mine Site, India - Sprayed Concrete - Optimisation
An example of Normet’s values and commitment in practice – new equipment on-site in 20 days
Crossrail C435 - Farringdon Station, United Kingdom - Sprayed Concrete Optimisation
Supplying the contractor with over 60% of the sprayed concrete solutions for Europe’s largest Metro project
Minera Tayahua, Mexico - Sprayed Concrete Optimisation
Spraying process improved by operator training, better fleet maintenance and TamShot 70AF
Santiago Metro, Chile - Sprayed Concrete Optimisation
Identifying challenges early on to support customer needs ahead of competition
El Teniente Mine, Chile - Sprayed concrete Optimisation
Reduced process cost, increased quality, and skilled operators for the future with Normet’s training
Crossrail C410 - Tottenham Court Road and Bond Street Station, United Kingdom - Sprayed Concrete Optimisation
Balancing Contractor’s needs with the Clients’s requirements beneath the heart of London
Drainage Service - Harbour Area Treatment, Hong Kong - Sprayed Concrete, Rock and Ground Support - Optimisation
Extreme underwater tunnelling conditions tackled step by step in Hong Kong
IDRIS MTS-01, Doha, Qatar - Sprayed Concrete - Optimisation
Versatile equipment range, technical site support and continuous product supply in difficult geological conditions
Crossrail Farringdon Station, United Kingdom - Waterproofing, Water Control - Optimisation
A combination of spray-applied membrane and sheet membrane enhances the best features of both systems
Shin Tomei Project – Kawanishi Tunnel by Shimizu, Japan - Sprayed Concrete Optimisation
The first project in Japan to introduce liquid accelerator solution for tunnelling
LKAB Malmberget Mine, Sweden - Sprayed Concrete, Rock and Ground Support - Optimisation
Reopening a mine two months in advance with 40,000 D-Bolt® installed
River Humber Pipeline, United Kingdom - Sprayed Concrete, Rock and Ground Support Optimisation
Creating a cost-effective backfill grout mix to meet the client’s specifications
MTRC West Island Line Extension, Hong Kong - Sprayed Concrete Optimisation
Creating a watertight permanent sprayed concrete lining with a controlled drainage path for underground storage
Fosterville Gold Mine - Sprayed Concrete Optimisation
Optimising the sprayed concrete process via the holistic portfolio, to improve from batching to spraying.
Multi-story Cark Park Leak Sealing Project
A leaking water dripping onto cars parked below can cause damage to the paintwork. Normet utilized TamAcryl 2000 and TamRez 310EU to solved the leaking.
KVMRT Station Project, Kuala Lumpur, Malaysia - Waterproofing - Optimisation
Early completion with our full waterproofing installation package
Palabora Copper Mine, South Africa - Rock and Ground Support - Improving the process
After years of searching, client finds a solution with Normet
LKAB Kiirunavaara and Malmberget Mine, Sweden - Rock and ground Support - Optimisation
A year’s worth of high-performance bolts for one of the largest underground Iron mines in the world
United Utilities – The ManTrunk Project, United Kingdom - TBM Technology Optimisation
A steep learning curve to match the geology with a right soil condition system