
Unleash Advanced Performance in Platinum Mining
Xrock X86-340R SUPER - Engineered for Excellence in Low-Profile Mining
The Xrock X86-340R SUPER is a cutting-edge boom system purpose-built for platinum mines, where efficiency, durability, and space optimization are paramount. Designed with precision, this horizontal stick boom system delivers an impressive vertical breaker reach of 3.3 meters, ensuring unmatched performance in confined, low-profile mining environments.
With seamless integration to Normet Xrock breakers and power units, the X86-340R SUPER offers:
- Exceptional Reach & Durability: Optimized motion and heavy-duty construction for peak reliability in challenging operations.
- Compatibility with Normet Xrock Breakers: Built to support breakers ranging from 280 kg to 610 kg, ensuring maximum versatility.
- Streamlined Hydraulic Power: The Normet Xrock PU18LP power unit complements the system, offering compact efficiency and simplified maintenance for uninterrupted operation.

360° Slew Capability for Ultimate Flexibility
Featuring a reinforced pedestal and a full 360-degree slew ring, the X86-340R SUPER delivers unparalleled stability and adaptability, even in the tightest spaces. Its robust, compact design maximizes efficiency without sacrificing performance.

Reliable and Operator-Friendly Controls
Equipped with a hydraulic control stand, the X86-340R SUPER offers effortless operation from a single standing position. This intuitive design ensures cost-effective and dependable functionality in the most demanding conditions.

Enhanced Performance and Reliable Availability
Built for the rugged demands of platinum mining, this advanced boom system ensures longer service life, reduced downtime, and superior efficiency. When space is limited, performance cannot be compromised – trust the X86-340R SUPER to deliver.